Case studies August 4th 2021
Casted Components
As impressive as the ready gearboxes, or the completed wind turbines are, they are a symphony of their parts. Some components are large, some are small, but they are all important in bringing clean renewable wind energy closer to everyone.
One such component are the castings us...
Read more
Case studies October 25th 2018
Trend of bigger wind turbines installed on lower wind sites has become evident for onshore wind turbine component suppliers. As rotor size increases, the input torque to be transmitted through drivetrain also increases. This puts torque transmitting components under increasing strength requirements....
Read more
Case studies November 7th 2017
Services spanning from predictive maintenance to up-tower repairs
Moventas high-qualified technicians and engineers can perform up-tower repairs even on non-Moventas gearboxes. Moventas team in Italy has recently completed successfully an up-tower repair on a 2 MW wind turbine. The work included th...
Read more
Case studies July 5th 2017
Non-inspectable bearings
Sometimes some bearings in wind turbine gearboxes are not reachable with endoscope probe. This is a common issue for specific gearbox models, where several bearings are partially or completely non-inspectable. That is caused by either the tight construction of the bearing i...
Read more
Case studies April 24th 2017
Moventas and SentientScience have studied GE 1.5 gearboxes as premature failures in the gearboxes are driving unexpected downtime and increased costs. The premature failure modes were prevented by Moventas upgrades and verified in DigitalClone® Software. The results of the computational testing are ...